888电子

新闻媒体
新闻媒体

以888电子热情和真诚实时为宽大客户朋侪提供优质的产品和知足的效劳。。。

What is the production capacity per week or per month ?


分类:

作者:

泉源:

泉源:

2020-11-13

  For the bare conductor, we can finish 3000 tons within one month. For power cables, that depends on the type and size. The total output value per month is approx. USD3,000,000.00 for insulated aluminum cables and that is approx. USD8,000,000.00 for insulated copper cables.

【网站地图】【sitemap】